PMU optimal placement in wide area monitoring systems using grey wolf optimization technique
No Thumbnail Available
Files
Date
2019
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Wide area monitoring system requires the integration of an advanced technology that provides real time synchronized phase angle measurements at all their measurement points. The phasor measurement units are the most advanced devices to achieve that. The objective of this work is first, to find the optimal placement of a minimum number of PMUs in some standardized IEEE systems. Next, the same method was applied to the Algerian 63 bus system. Two cases are taken into consideration: the minimum number of PMUs without considering the ZIB, then, considering the ZIB. The simulations are carried out using MATLAB/SIMULINK
Description
Keywords
Smart grid, Wide area monitoring systems (WAMS), Phasor measurement unit (PMU), OptimalPMU placemzent (OPP), Grey-Wolf optimization