Ouali, OussamaFrias, SamirBouchahdane, M. (supervisor)2023-06-062023-06-062020https://dspace.univ-boumerdes.dz/handle/123456789/1168668 p.The aim of this thesis is to provide a clear, practical and step by- step electrical installation design study of the wastewater treatment plant (WWTP) of Bordj Bou Arrerij (BBA), according to national and international Standards. The first chapter presents the methodology to be used, and refers to all chapters of the thesis according to the different steps of the study. The project will constitute a high qualified training for real electrical engineering project in order to blend in a professional environment.enElectrical installatioElectrical source studyWastewater treatment processElectrical installation design and study for the wastewater treatment plant (WWTP) of BBAThesis